Beaufort House, Bristol
Another successful high-rise project completed by Ashton Scaffolding Services at Beaufort House. Our team designed and installed a full access scaffold and temporary roofing system to facilitate a major refurbishment
We have a dedicated division of Scaffolders, to provide an excellent service to Commercial projects. Please see below samples of the work carried out.

Another successful high-rise project completed by Ashton Scaffolding Services at Beaufort House. Our team designed and installed a full access scaffold and temporary roofing system to facilitate a major refurbishment

Cantilevered access scaffolding designed over lower tiled roof to enable repairs to barge board, fascia and soffit.

Access Scaffolding within live airport environment to enable the removal of large advertising boards for replacement with LCD screens.

A pedestrian access bridge was designed over the waterway canal to allow the main contractor to repair the head walls for the local authority. The Operatives worked over the water

Working in a live, student environment at UWE Frenchay, our freestanding access scaffolding was designed for removing metal cladding for weather proofing. The scaffolding needed to be buttressed as no

Works undertaken during the summer 2024 school vacation period were split into 4 separate projects to enable roof repairs. Bristol Grammar School requested the erection of scaffolding to be built

We have had the pleasure to carry out scaffold works to allow the cleaning and restoration works to the organ in the beautiful Bristol cathedral

Client: TPS Construction Ltd February 22 To erect and dismantle fully boarded independent scaffolding. 5:3 board configuration using traditional scaffolding methods allowing roof coverings to progress early to enable internal

July 22 Erection of fully boarded independant scaffolding built in Haki universal system to the external perimeter of the English block for access to allow stone work cleaning and repairs,

Client Bristol Cathedral June 22 Supply and erect of 2 designed independant scaffoldlings. Built using Haki universal system to enable speakers to be positioned during a 3 year restoration period