HAKI System
Looking for Temporary Roofing? Ashton Scaffolding can offer the solution with the HAKI Roofing System.
Protection
Flexibility
Our HAKI systems means they can protect any construction project. Aluminium bridging beams can span up to 45m with Kedar tracking sheets attached, secured and tensioned at each end.
Advantages of the HAKI System
- Effective weatherproof seal
- Up to 5 times faster to install then traditional structures
- Economical
- Ridged, mono-pitch or polygonal roofs
- Effective for both large and small spans
Ashton Scaffolding are an approved HAKI installer for the South West.
Our Portfolio
Langton Street Bridge
Langton Street Bridge, better known by Bristolian’s as the “Banana Bridge” Structural strengthening of this pedestrian bridge is needed. The main contractor, Alan Griffiths contractors required an underslung access to
Bristol Grammar School
Works undertaken during the summer 2024 school vacation period were split into 4 separate projects to enable roof repairs. Bristol Grammar School requested the erection of scaffolding to be built
Restoration begins of Bristol Cathedral’s 340 year old organ
We have had the pleasure to carry out scaffold works to allow the cleaning and restoration works to the organ in the beautiful Bristol cathedral