Bristol Grammar School

Share This Post

Works undertaken during the summer 2024 school vacation period were split into 4 separate projects to enable roof repairs.

Bristol Grammar School requested the erection of scaffolding to be built utilizing Haki System Scaffold to allow it to be built quicker given the time restraints