
Bottle Yard Studio’s, Bristol
Designed buttress scaffolding due to not being able to tie the scaffolding into the existing structure, to give access for the Roofing Contractors to carry out their works.

Designed buttress scaffolding due to not being able to tie the scaffolding into the existing structure, to give access for the Roofing Contractors to carry out their works.

NASC – May 2018, successfully passed their recent audit and therefore continue to retain their NASC status

Independent scaffolding & birdcage scaffolding to allow the careful stripping out of the 1950’s Organ & Pipeworks to the facilitate the maintenance of the organ and allowing the commencement of

Scaffolding erected to 113no. – Two storey and three storey traditionally built houses on behalf of Linden Homes Western. Services providedAshton Scaffolding used the following services with Golden Valley:

Access scaffolding erected on behalf of WRW for the refurbishment works to Brunel House at Ashley Down College, Bristol. Services providedAshton Scaffolding used the following services with Ashley Down College:

Ashton Scaffolding provide scaffolding for painting works to St Annes Foot Bridge Bristol. Work carried out 2016-17 Services providedAshton Scaffolding used the following services with St Annes Foot Bridge:

Ashton Scaffolding provided support scaffold to enable Bridge repairs to Kingsweston Foot Bridge Bristol. Started: November 2015 and currently ongoing Services providedAshton Scaffolding used the following services with Kingsweston Foot

Contractor being Bristol City Council, who carried out total refurbishment of the famous Swing Bristol on Prince Street Bristol. Inclusive of construction of pedestrian walkway over the existing bridge structure.

Contractor: Bristol City Council, enable the re-strengthening of the retaining wall, along the Bridge Valley Road. Work carried out 2010-11 Services providedAshton Scaffolding used the following services with Bridge Valley:

The second phase of the Bristol Old Vic theatre redevelopment is a delicate job for contractor Gilbert-Ash – restoring and reconfiguring the Grade I-listed Georgian buildings and constructing an adjoining